Use Cases
Torrent Suite Software space on Ion Community
Change the Run Date
Occasionally, the Ion PGM, Ion Proton , or ion S5 sequencer cannot get a date/time from the internet time server. When this occurs, the sequencer date is set to January 1, 1969.
The date of the run is encoded in the folder name, which is parsed and used as the Run Date in the database. This causes the new run to be displayed with the incorrect date. With a date of January 1, 1969, the run is the last item on the last page of run reports listings in the Data tab.
Use the following procedure to change the date for this run:
- In the Torrent Browser Config tab, click Admin Interface and login, if prompted.
-
Click to open the
Experiments
database item for modification:
-
Find your run in the experiment name list. The list is sorted by date, starting with the newest runs in the database. Because the run from 1969 is at or near the end of the list, it is convenient to re-sort by date, in ascending order (oldest at top). Re-sort by clicking the
Date
column heading:
-
Click the
ExpName
for your run to select it and display the following run information:
-
Use one of the following two options to change the date:
a)Click the Today and Now buttons to set the Date and Time values to the current date and time in one click.
b) Manually edit the date/time strings. -
Click
Save
, on the bottom right to save the new date:
- Return to the Data tab when done.
Introduction
Realign Run to Different Reference Genome
Reanalyze with a Different DNA Barcode Set
Use DNA Barcodes with the Ion Torrent™ Sequencers
Overview of the BaseCaller and Barcode Classification
Troubleshooting Barcode Classification Issues
Custom Barcode Design
Scan Your Sequencing Kit
Handle a Failed Analysis Run
Determine the Fault Cause
Restart a Run
Terminate an Analysis Run
Work with Files
Work with the Database
Change the Report Name
Change the Run Date
Add or Change an Ion PGM™ or Ion Proton™ Instrument
Change Your Torrent Browser Password